Data Centre Cable Containment

Scope

Two white-space halls needed overhead containment that would not interfere with hot-aisle return airflow or the sprinkler main. The containment also had to support later additions of fibre basket and power tray without re-drilling the soffit.

What we delivered

Result

Zero site clashes were reported during installation, and the client added a third hall on the same design without changes to the support grid.

Leave a message

Leave a message