Data Centre2025
Data Centre Cable Containment
Year2025
ClientCloud Infrastructure Operator
LocationShanghai, China

Scope
Two white-space halls needed overhead containment that would not interfere with hot-aisle return airflow or the sprinkler main. The containment also had to support later additions of fibre basket and power tray without re-drilling the soffit.
What we delivered
- Bespoke trapeze hangers combined with threaded rod and channel, modelled against the MEP coordination drawings.
- Segregated power and data routes with 300 mm separation maintained at every crossing.
- Pre-galvanised finish with an additional powder coat on exposed runs in the client-facing areas.
- BIM-ready layout drawings issued for clash detection before fabrication.
Result
Zero site clashes were reported during installation, and the client added a third hall on the same design without changes to the support grid.